欢迎您访问莱州聚峰机械有限公司网站!
搅拌机行业持续先行者!
点击拨打服务热线:400-879-1999
您的位置: 首页 > 新闻资讯搅拌机运行需要注意什么?

新闻资讯

产品

新闻

  • 小型搅拌机的正确操控有哪些要求
  • 搅拌机使用时4大“控制”达到目的
  • 混凝土搅拌机检修的方法有哪些
  • 小型搅拌机零件气门的顺利使用方式
  • 混凝土搅拌机的操作保养关注事项
  • 什么原因导致搅拌机存在抱轴问题

全国服务热线

400-879-1999
新闻资讯 /

搅拌机运行需要注意什么?

来源:http://www.zkhntjbc.com/ 日期:2021-08-18
概述:搅拌机的正常运行是每个用户都想看到的,这就要求用户在使用搅拌机时要注意以下三个环节:
混凝土搅拌机的正常运行是每个用户都想看到的,这就要求用户在使用搅拌机时要注意以下三个环节:
The normal operation of concrete mixer is what every user wants to see, which requires users to pay attention to the following three links when using the mixer:
1.搅拌机运行前:混凝土搅拌机运行前后,传动机构、工作装置、制动器等。应进行可靠的检查和紧固,以确保正常运行。大齿圈、皮带轮等部件上应安装防护罩,搅拌筒、支撑传动和运动部件以及仓门、斗门和轨道内不得有异物卡住。
1. Before mixer operation: before and after concrete mixer operation, transmission mechanism, working device, brake, etc. Reliable inspection and fastening shall be carried out to ensure normal operation. Protective covers shall be installed on the large gear ring, belt pulley and other parts, and there shall be no foreign matter stuck in the mixing drum, supporting transmission and moving parts, bin door, bucket door and track.
混凝土搅拌机运行应注意的方面
Aspects needing attention in the operation of concrete mixer
混凝土搅拌机
2.混合器正在运行:
2. Mixer is running:
(1)进料时,严禁将头或手伸入料斗和机架,操作时不得用手或工具等东西伸入搅拌筒扒料卸料。
(1) During feeding, it is strictly prohibited to extend the head or hand into the hopper and frame. During operation, it is not allowed to extend hands or tools into the mixing drum for material stripping and unloading.
(2)料斗上升时,禁止在料斗下工作或行走。料坑底部应为料斗提供一个枕头,在清理料坑时,料斗应使用链条固定。
(2) When the hopper rises, it is forbidden to work or walk under the hopper. A pillow shall be provided for the hopper at the bottom of the pit, and the hopper shall be fixed with a chain when cleaning the pit.
(3)向搅拌筒加料应在运行中进行;添加新材料只能在搅拌机中所有的原混凝土卸载后进行。除反向卸料外,不要中途停止搅拌机或在搅拌机满载时启动搅拌机。
(3) Feeding to the mixing drum shall be carried out during operation; The addition of new materials can only be carried out after all the raw concrete in the mixer is unloaded. Except for reverse unloading, do not stop the mixer halfway or start the mixer when the mixer is full.
(4)作业时,如故障不能继续运行,应立即切断电源,将搅拌筒内的混凝土清理干净。
(4) During operation, if the operation cannot continue due to failure, the power supply shall be cut off immediately and the concrete in the mixing drum shall be cleaned.
3.搅拌机运转后:当混凝土搅拌完成或预计停止1小时以上时,除了排出剩余的材料外,还应将石头和清水倒入振动桶中,并打开搅拌机,将附着在桶上的砂浆清洗干净后排出。桶内不得有积水,以防桶和叶片生锈。同时,还应清理搅拌筒外积聚的灰尘,以保持机器的清洁和完好。
3. After the operation of the mixer: when the concrete mixing is completed or is expected to stop for more than 1 hour, in addition to discharging the remaining materials, pour stones and clean water into the vibrating bucket, turn on the mixer, and clean the mortar attached to the bucket before discharging. There shall be no ponding in the barrel to prevent the barrel and blades from rusting. At the same time, the dust accumulated outside the mixing drum shall also be cleaned to keep the machine clean and intact.

截屏,微信识别二维码